Client

EDF Energy

Building Use

Offices and welfare facilities

Project Duration

3 weeks

Procurement Method

Hire

Why hire from portakabin

Project Features

  • Three storey project offices and welfare facilities
  • 90 fully-fitted, steel-frame modules
  • Desk space for 220+ staff
  • Meeting and IT rooms
  • Welfare accommodation including 1,200 lockers, changing rooms, showers, and drying space
  • 450-seat multi-use canteen
  • Ventilation and climate control systems
  • Fire alarms
  • Emergency lighting
  • Data communications
  1. The need for large-scale infrastructure at Hinkley Point C

    Hinkley Point C is a landmark project, representing the first major nuclear power station to be built in the UK in nearly 30 years. Once completed, this state-of-the-art nuclear power station will supply 7% of the UK’s electricity. As construction progresses, the latest contract was awarded to Portakabin for a huge 3,450m2 modular building. This large-scale modular office and site welfare facilities complex provides high-standard workspaces for the rapidly increasing number of staff and contractors working directly on the Hinkley Point C development. Delivering this premium modular building was essential to support the day-to-day operations of the nuclear power station workforce. 

  2. The delivery of a premium modular building

    The impressive three-storey ‘East Office Annex’ modular building provides desk space for more than 220 staff working on the civil construction. This modular office layout includes modern meeting and IT rooms, alongside high-quality welfare facilities for the site workforce. These essential welfare facilities include 1,200 secure lockers, changing rooms, showers, and drying space, as well as a 450-seat multi-use canteen which serves around 1,350 meals a day. 

    The project's modular office spaces were built and fitted out to create a high-specification working environment. The features include advanced ventilation and climate control systems, fire alarms, emergency lighting, data communications, and a lift for disabled access to the upper floors. To reduce on-site work at Hinkley Point C, which is one of the UK’s largest and most complex construction environments, Portakabin manufactured the structure off-site. As a result, Portakabin successfully installed 90 fully-fitted, steel-frame modules to complete the modular office and welfare facilities in just three weeks, minimising disruption at the nuclear power station site. 

Portakabin met all our requirements for build quality, design, flexibility, stringent health and safety standards, and speed of delivery. We wanted an interim building that would maintain the high standard of office accommodation and welfare facilities that we already have on this site.

Gez Farnsworth, Project Manager, EDF Energy

Modular welfare and office spaces

Portakabin designs bespoke, modern staff and office facilities tailored to enhance operational efficiency and workforce comfort. Discover how our modular spaces streamline your upcoming manufacturing project. 

Case Studies
Fully inclusive and free
GET A QUOTE
Get your free brochures
DOWNLOAD
Book an appointment
BOOK
Back to Top