Macallan Distillery
As The Macallan opened a brand new distillery and visitor experience, the team needed an office complex installed on site within a tight deadline
- Manufacturing
- Office
- 10 - 50
The new scheme is the first purpose-designed fluid production and technical facility for electronic cigarettes to be built in the UK. It has enabled the company to increase capacity to over 10 million bottles of premium quality e-liquid every year for the UK, USA and worldwide markets.
The use of a modular building from Portakabin reduced the build time for the facility to just four months to give Totally Wicked the benefit of earlier occupation. This also allowed production capacity to be increased, and facilitated the company’s expansion at an earlier stage.
Finished in anthracite grey with striking chilli red stripes to reflect Totally Wicked’s strong corporate image, the scheme accommodates a new production facility on the ground floor, complete with test room, fluid mixing area, bottling plant and a highly insulated cold room. New offices are located on the upper floor.
Around 30 people work from the building to meet the growing demand for Totally Wicked’s e-liquid products. Portakabin was principal contractor for the project and managed complex excavations on the challenging sloping site; construction of stone retaining walls; foundations, design, building installation and landscaping.
The building also has a high performance preinstalled concrete floor at ground floor level to provide a robust, lasting and clean finish for the production areas. The landscaping included tree planting and an external break-out space for staff.
As The Macallan opened a brand new distillery and visitor experience, the team needed an office complex installed on site within a tight deadline
After a fire destroyed office buildings of Wiltshire Farm Foods, Portakabin worked to create a permanent solution within just six months
Two spacious open-plan offices, meeting room, data cabling, fire alarm and intruder alarm systems.