A bespoke sixth form block delivered in under seven months.
Extra robust double boarded floor, aluminium external finishes, feature window reveals, platform lift for DDA access, science lab and common room and wellbeing garden.
- Education
- School
- 100+
Case Studies
Every organisation starts with a vision. These case studies show how ideas became places that support people, solve challenges and create opportunities. Explore the projects behind the outcomes and see what's possible when you choose to partner with Portakabin.
73 project results
Extra robust double boarded floor, aluminium external finishes, feature window reveals, platform lift for DDA access, science lab and common room and wellbeing garden.
Three modular laboratory buildings with Category 2 wet laboratories, constant-temperature rooms, specialist testing booths, teaching laboratories, research facilities, office accommodation, specialist ventilation and gas detection systems.
Known as the fastest school ever built, KAA2 was an unprecedented project from start to finish and took a record-breaking nine weeks to build.
Alternative provision classroom for 50 students, including staff and student toilets, intervention room, reception area and store cupboard.
Modular classrooms, breakout and counselling spaces, isolation room, WC facilities
Bespoke kitchen and catering fit out, branded interior and exterior options, climate control for year-round comfort, challenging groundworks and site landscape
Bespoke science and food technology laboratories, fully fitted ICT suites, large dining hall and fitted catering kitchen, air conditioning and ventilation throughout, Security and safety alarms, access control and CCTV
External bespoke cladding, performance-enhancing thermal technology, accessible lifts, art rooms and computer suites
Hygienic wall coverings, walk-in cold room, lobby with glazed automated doors, full laboratory fit-out, foundations and services, foul water treatment plant, external cladding and fencing
Water and waste connections, external ramp for access, air conditioning throughout, groundworks, foundations and pathways
Air conditioning and ventilation throughout, full groundworks and service connections, car park and EV charging points, fire alarm, intruder alarm, access control, key suiting and CCTV
If a project you've seen has sparked an idea, let's talk. Our experts will work with you to understand your needs and develop a space solution bespoke to your site, timescales, immediate and future plans.
From the first conversations to our final handover, we're here to turn problems into possibilities.
Whether you’re planning a new facility or working through a complex set of project requirements, we’ll help you understand the options and find a practical way forward.