Client

Special Melted Products

Building Use

Training facility

Project Duration

3 weeks

Procurement Method

Hire

Why Hire?

Project Features

  • Branded vinyl wrap on exterior
  • Branded glazed partition
  • Fully accessible – ramp
  • Air Conditioning
  • Data
  • Furniture
  1. Special Melted Products contacted Portakabin with the need for a modern, high-quality staff training facility to be located at one of their three Sheffield sites. After a visit to our Sheffield Hire & Visitor Centre to take a look around potential solutions, Special Melted Products found a building to fit their requirements and began finalising bespoke details with the Portakabin team.

  2. The Portakabin Titan range includes the largest self-contained building in Europe which can be delivered by road as a single unit. Special Melted Products selected a 45m2 building featuring a branded glazed partition which allows for maximum daylight to enter the building as well as providing an open plan feel which also offers separate working areas.

    In less than ­a month, Portakabin provided a solution fully equipped with data services, furniture, and air conditioning which allows for a bright, comfortable space for a training facility.

Back to Top