Northumberland County Council
School buildings across nine different sites
- Education
- School
- 100+
As part of the Government’s £4.4 billion Priority School Building Programme (PSBP), which rebuilds or refurbishes school buildings in the worst condition across the country, Portakabin was awarded a contract to deliver six schools in the Surrey and Kent batch. All six schools would be produced off site and would replace the current facilities, which would then be demolished and removed. Wanting to create outstanding environments for teaching and learning, the offsite approach to the scheme would reduce the build programme, much to the benefit of the children’s education by reducing disruption during construction.
Designed by specialist architects, each school would have state-of-the-art education facilities to replace sub-standard accommodation in poor condition. The designs, which have been developed in close collaboration with teaching staff, will maximise natural light and ventilation, and feature two two-storey classroom wings. These are separated by a central ‘street’ which runs the full length of the building and provides good passive supervision and zones for informal learning. The buildings will also have high levels of natural light to improve concentration levels, and increased access and space for outdoor play and learning.
Throughout the scheme, Portakabin was able to develop a modular multi-purpose hall for two of the schools following learnings made on site while the programme progressed.
The design of the schools meant they were built over two storeys and made up of 30+ modules. The modules were manufactured and fitted out offsite at the Portakabin manufacturing facility in York while foundations and groundworks continued onsite in preparation for the modular building to be craned into position during the school holidays. This flexibility is a valuable benefit of using off-site construction. Minimising on site disruption is critical for these schools.
Once in place, the module interiors were finished on site and included; full interior decoration, joinery works, lift installation, internal light wells fitted between floors, full kitchen furnish, ICT placement, new incoming mains services and construction of partition walls.
The team at Portakabin had over 40 operatives on site each week to ensure the children were in their new school in time for the start of term. Designed with a modern learning environment in mind, the school has teaching spaces for reception, infants and junior pupils as well as a multi-purpose hall, kitchen and food science teaching room as well as a play area and landscaped gardens outside.
School buildings across nine different sites
To ensure Buckingham Hall had a professional dance facility, Portakabin designed a studio with specialist recessed lighting & heating.
University College London had a requirement for teaching facilities to be in use for two years while its major capital programme is underway